For the Developper /Owner
Accelerated construction schedule.
Decrease in project financing cost.
Shorter schedule results in improved
cash flow. Directly usable concrete surface.

For the Engineer and Architect
Improved wind and seismic resistance.
Monolithic wall and slab.
Flexibility of tunnel.
Savings in foundation design.
Excellent soundproofing.

For the Builder
Excellent labor productivity.
Minimal formwork required.
The wall and slab formwork are
reusable.

Key benefits
Average 25 % saving in time
Reduced maintenance costs
Average 15 % cost saving
over competition